Religious Education Building will remain open for programming until early May. The main entrance of the building has been temporarily relocated to the east side of the building (purple dot). Prior to the building's closing, sweat equity work will occur inside as parish crews remove cabinetry, ceiling tiles and other fixtures that will be used in the new space. The buildings will still be safe and accessible to ministries during sweat equity work. Learn about plans for the Religious Education building |
|
Construction Entrance: Please avoid using the construction entrance and parking a vehicle near the loop outside Parish and Weitzel halls. This entrance near Parish Hall is designated for construction crews only. Parishioners and guests may enter the campus through either the northwest or south driveways (see campus map). |
|
Parish Hall will remain open for scheduled programming and events through mid-May. If you should need to access the parish hall before that time, please park in one of the lots and walk to the main doors of the building. Prior to the building's closing, sweat equity work will occur inside as parish crews remove cabinetry and other fixtures that will be used in the new space. The buildings will still be safe and accessible for ministries during sweat equity work. Do not park along the circle drive outside the front of the hall. Construction crews will be entering and using the drive located near Parish and Weitzel halls. Learn about plans for Parish Hall |